PERT - CPM :
by Munier, Nolberto J.
Series: Area empresarial. Edition statement:5a. ed., rev. Published by : Astrea, (Buenos Aires :) Physical details: 216 p. : il. ; 23 cm.
Subject(s):
Arquitectura.
|
Administración.
|
Técnicas de revisión de proyectos.
|
Técnicas de evaluación de proyectos.
|
PERT.
|
CPM.
Year: 1981
Item type | Current location | Call number | Status | Date due |
---|---|---|---|---|
Libros y Folletos | Biblioteca Central | 65.012.261 M925p5 Ej.3 (Browse shelf) | Available | |
Libros y Folletos | Biblioteca Central | 65.012.261 M925p5 Ej.4 (Browse shelf) | Available | |
Libros y Folletos | Biblioteca Central | 65.012.261 M925p5 Ej.1 (Browse shelf) | Available | |
Libros y Folletos | Biblioteca Central | 65.012.261 M925p5 Ej.2 (Browse shelf) | Available |
Browsing Biblioteca Central Shelves Close shelf browser
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
65.012.261 M925p5 Ej.1 PERT - CPM : | 65.012.261 M925p5 Ej.2 PERT - CPM : | 65.012.261 M925p5 Ej.3 PERT - CPM : | 65.012.261 M925p5 Ej.4 PERT - CPM : | 65.012.261 St53p4 Ej.1 PERT : | 65.012.261 St53p4 Ej.2 PERT : | 65.012.261 W125 Ej.1 Los sistemas de planificación CPM y PERT aplicados a la construcción / |
Bibliografía: p. 215-216.
Capítulo 1. Generalidades. Capítulo 2. Aplicación de probabilidades al graphe. Capítulo 3. Otras aplicaciones del camino crítico. Capítulo 4. Método Pert generalizado. Capítulo 5. Programación con recursos limitados. Capítulo 6. Programación con recursos limitados y su balanceamiento (RAMPS). Capítulo 7. Pert-costo.
There are no comments for this item.